Disaster Management · TEE · papers
Q1D · Summarize the key details (5 points) for the case study of “The Panshet Dam Burst Flo…
2025-12-10 · Semester V final
Actual TEE paper · 100 marks · 3 hours · Q1 + any four of Q2–Q7
Q1D. Summarize the key details (5 points) for the case study of “The Panshet Dam Burst Floods” [5 marks]
Answer
- Event and setting: Failure of Panshet Dam on 12 July 1961 released floodwater into the Pune river system and contributed to severe flooding.
- Causes and vulnerability: A dam-failure release created rapid downstream inundation; downstream settlements and infrastructure were exposed.
- Impacts: Severe damage to housing, property and services and large-scale displacement in Pune.
- Response and recovery: Emergency evacuation and relief were followed by rebuilding and review of dam and flood safety.
- Lessons: Combine sound design and construction quality with dam surveillance, safe operation, breach-inundation mapping, downstream warnings and rehearsed emergency action plans.
The key date is 12 July 1961. The event involved rapid flooding followed by a much longer recovery; avoid inventing one exact duration or casualty figure when it is not supplied or verified.